Remember that permeable driveways are now the only alternative for your driveway
Guidance from the government now advises all renovations and renewals to be permeable.
https://www.gov.uk/government/publications/permeable-surfacing-of-front-gardens-guidance
As covered in our last blog Permeable paving does not have to be a daunting prospect there are many options to choose from that in turn create many different looks once finished.
https://spudulica.co.uk/2022/03/28/what-is-permable-paving-do-i-need-it/
EcoGrid E40 is a world leading permeable paving solution look at its credentials also used by NATO.
https://ecogrid.co.uk/products/
Test certifications are –
- DIN 4102 – Approval emergency access routes, fire resistance
- DIN 1072 – Approval for 40 tonne axle load, driveways, road extensions, bridges
- DIN IN ISO 124 and B125 – Approval for car parks, access roads & storage areas
- DIN 38412 Environmentally neutral, safe & tested OECD 202:2004
- Point axle loading up to 40 T/m², DIN 1072:1985
- UV-resistant, certified DIN EN 60068-2-5
- Heavy-duty, tried and tested DIN EN 124:2011
Its also quick and easy to fit, locking into place easily. 100% recycled and can hold up to heavy loading what more do you need for a permeable paving solution!
https://spudulica.co.uk/product/ecogrid-e40-virtually-indestructible-paving-grid-20-year-guarantee/
.
How to Step by Step – gravel filled example
- Excavate drive to 300mm below finished floor level.
- Excavate material to be removed.
- Install ducts as required for power and water.
- Spread geotextile ground stabilising fabric over the base, back fill to 210mm depth with MOT type 1 X reduced fines to allow rainwater to permeate away from the surface.
- Compact
- Cover the base with second layer of membrane to prevent sand wash out into the voids in the MOT Type 1X.
- Spread with 50mm depth of flooring sharps sand. Compact well.
- Cover with a third layer of membrane to stabilise the EcoGrid paving.
- Fit the EcoGrid E40.
- Back fill with 10mm depth of gravel.
- Top soil and seed around the edges to finish.
Send us your requirements and we can help you get started on your new permeable driveway.